cs: 054-701-1550

Capabilities미래, 그 이상을 창조하는 기업 성진원자력기술이 만들어나갑니다.

Nuclear Power Solution

Sungjin Nuclear Engineering Co.,Ltd (SNE) provides high quality technical consultation,technical site support, engineering, licensing, and plant safety & optimization to key players in the nuclear industry.

Capabilities

SNE has well trained and qualified human resources who have experience in operation and licensing and engineering in Nuclear Power Plants in Korea. SNE is already supporting foreign companies in safety related system engineering, installation, modification, licensing, field service, consulting, and decommissioning. SNE has its own QAM and QAP, and is ISO 9001certified.

Key Members Experiences

Myungjin Shin, Chief Executive Officer

Licensing & System Engineering Specialist

Past Employer: Korea Electric Power Corporation (KEPCO), Korea Hydro & Nuclear Power Corporation (KHNP), KONEC Korea, and Gnest Korea

Mr Shin has over 35 years of continuous work experience in the nuclear industries and has acquired considerable knowledge of PHWR operating experience, review of safety related documents, operating related procedures, management of licensing affairs. Especially, he participated in the Retubing and Refurbishment project of Wolsong Unit 1. He has successfully carried out on-site technical support for the domestic nuclear power plant projects of foreign companies like KINECTRICS and Framatome. He has an excellent network with major equipment supplies, design and maintenance companies, engineering & construction companies, ect. in Korea as well as other key player in the nuclear industries around the world.

Mr. ChungHee Park, Chief Researcher

Project Management and Mechanical Engineering Specialist

Past Employer: Korea Electric Power Corporation (KEPCO) and Korea Hydro & Nuclear Power Corporation (KHNP)

Mr. Park has more than 30 years of experience in mechanical engineering including supervising, planning, work design, technical review, project management, system development, etc. He leads the mechanical engineering team/planing team/refurbishment team of KHNP Wolsong 1 during Retubing and Refurbishment Project. He successfully carried out the Refurbishment Project while working as a Director at the Kori 1 and Shin Kori NPP, which are PWR. He also involved in the Plant commissioning as a startup system engineer for Baraka Unit 1&2 in the UAE.

Byung-Duck Cho, System Engineering Specialist

Past Employer: Korea Electric Power Corporation (KEPCO) and Korea Hydro & Nuclear Power Corporation (KHNP), and KONEC, Korea

Mr. Cho, a system engineering specialist, has more than 30 years of PHWR operating experience and has a Senior Reactor Operator license. He has acquired considerable knowledge of PHWR system operation, modification of system and equipment, review of safety related documents, Code & Standards, operating related procedures. Based on these experiences, he has successfully performed various projects: (1) CFVS licensing support for Wolsong Unit 1 (2) Code Reconsiliation for Wolsong Unit 2,3&4 CFVS Technical Standard (3) Developement of ITS for Wolsong (4) Licensing and Design Support of Calandria Vault Water Makeup for Wolsong Unit 1&2

Sang-Koo Han, Mechanical Engineering Specialist

Past Employer: Korea Electric Power Corporation (KEPCO), Korea Atomic Energy Research Institute (KAERI), KEPCO Engineering & Construction Company Inc.. (KOPEC), GNEST Inc., Atomic Creative Technology Company LTD (ACT)

Mr. Han has experienced over 40 years in Nuclear Industries, such as operation for Kori nuclear power plant 1, process system design for nuclear power plants, and technical support for nuclear power plants. He has participated in the fluid system design for Wolsong Units 2,3&4, comprehensive revision of the Final Safety Analisis Report (FSAR) for Wolson Unit 1, retubing and refurbishment project for Wolsong Unit 1, flow measurement of each fuel channel for Wolsong Unit 1, fuel channel shift for Wolsong Units 1&2, and deterministic and provability safety analysis (PSA) for Wolsong plants.

Yong-Chan Lee, Mechanical Engineering Specialist

Past Employer: Korea Electric Power Corporation (KEPCO) and Korea Hydro & Nuclear Power Corporation (KHNP)

Mr. Lee has experienced over 40 years in Nuclear Industries. He participated in the construction and commissioning of Wolsong Nuclear Power Plant Unit 1, worked as a turbine and field operator of Wolsong Unit 1, In-service test technical support of Wolsong Unit 1, operation team of Wolsong unit 1 during retubing and refurbishment project, and development of improved technical specification (ITS) of Wolsong Unit 2,3&4.

Byoung-Man Moon, Quality Management & Electrical Engineering Specialist

Past Employer: Korea Electric Power Corporation (KEPCO) and Korea Hydro & Nuclear Power Corporation (KHNP), Soosan Industries, Korea

Mr. Moon has experienced over 40 years in Nuclear Industries. He participated in the commissioning of electrical facilities of Kori Nuclear Power Plant Unit 3&4. Verification and revision of the design drawings of Hanul Units 1 and 2 / Construction management, electrical, instrument and controller quality inspection of Hanbit Units 3 and 4 / Construction management and construction cost management of Hanul Units 5 and 6 / Quality inspection of electrical, instrument & controller of Hanul Unit 3,4 / Maintenance of electronic equipment of Kori Unit 1,2 / Quality inspection of electrical, instrument & controller of the UAE Baraka Nuclear Power Plant / Quality audit of the headquarters of KHNP / Also, he participated in the technical support and supervision of the installation of electronic equipment of Seul Units 3 and 4.

Seong-Soo Kim, System Engineering Specialist

Past Employer: Korea Electric Power Corporation (KEPCO) and Korea Hydro & Nuclear Power Corporation (KHNP)

Mr. KIM has experienced over 40 years in Nuclear Industries. He participated in the field/MCR(Main Control Room) operation of Wolsong Nuclear Power Plant Unit 1. In addition, he conducted engineering related to the operation and commissioning of Wolsong Units 1, 2 and trained and supported shift workers at Wolsong Training Center. He performed radiation safety management at Wolsong Unit 1 and Kori Unit 2, Hanul Unit 1. Also, he conducted engineering management at Kori Unit 2.